|
|
| Virtual Buildings Program |
| The Virtual Building Program is a business location alternative to an existing building. A virtual building is a business location where all the preliminary work has been completed in order to start construction immediately on the building. The building has been designed, all utilities are to the site, the development team is in place, firm cost estimates and a construction schedule have been established and the site plan permit obtained. The virtual building has all the required elements in place to deliver a building suited to your specific needs within fixed costs and timeframe. |
- Virtual Industrial Buildings Search
- Virtual Office Buildings Search
|
Technology Zones |
| Technology zones allow localities to create special incentives for qualified businesses locating or expanding operations in a zone. These incentives may include a reduction of user and permit fees, local tax incentives, special zoning treatment, exemption from local ordinances or other incentives adopted by ordinance. Incentives may be provided for up to ten years. |
- Industrial Buildings in Technology Zones Search
|
Right Now Sites |
| The Right Now Sites Program is designed to ensure business prospects and consultants that those business properties designated Right Now Sites have all the essential elements in place for rapid business location. The Right Now Sites Program establishes minimum infrastructure requirements for eight industry groups (light manufacturing, general manufacturing, heavy manufacturing, mega sites, business/industrial parks, office parks, warehouse/distribution and research and development). In addition to these industry-specific standards, separate "readiness standards" have been established to ensure that these sites are truly ready to go. The Virginia Economic Development Partnership has determined that each site designated as a Right Now site has met the minimum readiness standards and one or more industry-specific criteria. |
Light Manufacturing Right Now Site Criteria Search
- Industrial zoning
- 5+ developable acres
- 6" water line (with 20,000gpd capacity)
- 8" sewer line (with 20,000gpd capacity)
- 3-phase electric (5,500kw)
- Interstate or 4-lane highway within 20 miles
- Industrial access road
|
General Manufacturing Right Now Site Criteria Search
- Industrial zoning
- 10+ developable acres
- 8" water line (with 100,000gpd capacity)
- 8" sewer line (with 100,000gpd capacity)
- 3-phase electric (10,000kw)
- T-1 line onsite
- Interstate or 4-lane highway within 5 miles
- Industrial access road
|
Heavy Manufacturing Right Now Site Criteria Search
- Industrial zoning
- 25+ developable acres
- 12" water line (with 600,000gpd capacity within 180 days)
- 12" sewer line (with 450,000gpd capacity within 180 days)
- 3-phase electric (25,000kw)
- Gas available
- T-1 line onsite
- Interstate or 4-lane highway within 1 mile
- Industrial access road
|
Business/Industrial Park Right Now Site Criteria Search
- Business or Industrial zoning
- 50+ developable acres, 5-acre site available
- 8" water line (with 200,000gpd capacity)
- 8" sewer line (with 200,000gpd capacity)
- 3-phase electric (14,000kw)
- T-1 onsite
- Commercial airport within 90 miles
- Interstate or 4-lane highway within 10 miles
- Industrial access road
|
Mega Site Right Now Site Criteria Search
- Agricultural or rural zoning
- 500+ acres, 200 acres developable
- Water line within 3 miles (with 250,000gpd capacity)
- Sewer line within 3 miles (with 250,000gpd capacity)
- Electric transmission line within 3 miles
- Gas transmission line within 3 miles
- T-1 line or fiber at access road
- Interstate or 4-lane highway within 5 miles
- Rail within 1 mile
|
Warehouse/Distribution Right Now Site Criteria Search
- Warehouse/Distribution zoning
- 25+ developable acres
- 6" water line (with 6,000gpd capacity)
- 8" sewer line (with 6,000gpd capacity)
- 3-phase electric (2,500kw)
- Interstate or 4-lane highway within 5 miles
- Industrial access road
|
Research and Development Right Now Site Criteria Search
- Research and Development zoning
- Research university within 60 miles
- 5+ developable acres
- 6" water line (with 2,500gpd capacity)
- 8" sewer line (with 2,500gpd capacity)
- 3-phase electric (600kw dual service)
- T-1 line or fiber onsite
|
Office Park Right Now Site Criteria Search
- Business or Office Park zoning
- 5+ developable acres
- 6" water line (with 15,000gpd capacity)
- 8" sewer line (with 15,000gpd capacity)
- 3-phase electric (1,500kw dual service)
- Multiple T-1 lines or fiber onsite
|
Motorsports Right Now Site Criteria Search
- Industrial zoning
- 5+ developable acres
- 6" water line (with 20,000gpd capacity)
- 8" sewer line (with 20,000gpd capacity)
- 3-phase electric (5,500kw)
- Interstate or 4-lane highway within 20 miles
- Industrial access road
- Direct connection to a motorsports asset
- Marketing materials or program targeting the motorsports industry
|
|
|